CBRNSimulation Systems
CBRN Defense · Tactical Nuclear Fallout & Armor Wash

Nuclearfallout

Tactical nuclear fallout decontamination for combat vehicles and crews in hardened facilities in VR. High-pressure radioactive fallout blast wash, NBC filtration exchange, and shelter airlock ingress.

Scroll
NUC · Procedure

Six steps — Nuclear fallout washdown protocol

Simulation rule

Tactical nuclear fallout emits penetrating gamma radiation. Rapid high-volume standoff deluge is required to achieve rapid dose attenuation before crew evacuation.

  1. 01

    Gross fallout survey & hot-line staging

    Direct contaminated armored vehicle into blast-hardened wash hangar. Conduct rapid standoff radiation survey to identify hot spots on roof armor and chassis.

  2. 02

    Automated underbody high-volume deluge

    Trigger submerged floor deluge manifold with multi-nozzle high-volume jets, stripping irradiated soil, mud, and road fallout from wheels, tracks, and hull underside.

  3. 03

    High-pressure thermal surface sweep

    Multi-operator washdown using 90°C high-pressure lances. Top-down sweep breaks the bond of vitrified fallout dust from sloped composite armor plates.

  4. 04

    NBC air filtration & pack exchange

    Decontaminate external intake cowlings before unsealing vehicle NBC filtration bay, safely depositing irradiated HEPA/charcoal canisters into sealed bunker vaults.

  5. 05

    Crew tactical egress & personal scan

    Crew dismounts directly through pressurized sealed vestibule tunnel without contact with vehicle exterior. Instant personal dosimeter and contamination portal check.

  6. 06

    Hardened bunker airlock clearance

    Personnel pass through multi-chamber collective protection airlocks into the command shelter following verified baseline radiation clearance.

Debrief

Scored on standoff distance & rapid dose attenuation

  • Gross deluge timing
  • Underbody blast coverage
  • Thermal lance sweep
  • NBC filter vault disposal
  • Hardened airlock transit
After-action review NUC
AFTER-ACTION REVIEWNUC · RUN 0487PASSGross deluge timing91%Underbody blast coverage85%Armor sloped sweep89%NBC filter disposal100%Hardened airlock transit95%TIMELINE · 21:10IngressDelugeThermal washFilter swapCrew egressBunker lock
Next bayVDSVehicle Decontamination SystemEnter

Prepare for the Critical
Train Beyond Reality

Request a demo